Mole Plow isn't just another tillage tool , it's a game changer
Mole Plow isn't just another tillage tool , it's a game changer
What are mole drains?
Mole drains are unlined tunnels (mole channels) in the clay subsoil formed by a mole plow.
Mole Plowed soil cross-cut profile
Drain excess water from the soil profile
Pre-cut disc eliminating trash build-up
Max depth plate &
Replaceable expender
What are mole drains?
Mole drains are unlined tunnels (mole channels) in the clay subsoil formed by a mole plow.
Mole Plowed soil cross-cut profile
Drain excess water from the soil profile
Pre-cut disc eliminating trash build-up
Max depth plate &
Replaceable expender
Why install mole drains?
Why install mole drains?
In soil where surface drainage is insufficient for addressing excess water problems, where installing subsurface (tile) drainage is uneconomical due to cost.
In soil where surface drainage is insufficient for addressing excess water problems, where installing subsurface (tile) drainage is uneconomical due to cost.
In heavy clay soil and low permeability, mole drains can drain excess water from the soil profile.
In heavy clay soil and low permeability, mole drains can drain excess water from the soil profile.
Mole drains can leach the saline down over the initial few years after installation
Mole drains can leach the saline down over the initial few years after installation
Soil cracks created from moling increase infiltration and water movement
Soil cracks created from moling increase infiltration and water movement
Benefits of Mole Plowing
in heavy soil:
Suitability of mole drains
Moling is very suitable in heavy soil with a minimum of 45% clay content and less than 20% sand at the mole depth
Best time to install mole drains?
Best installation conditions usually occur during the summer months, when upper soil layer is as dry as possible
Combining mole drains with subsurface drainage
Mole drains can be combined with subsurface drainage to improve drainage performance in heavy clay soil. In this system, mole drains are installed perpendicular or diagonal to the subsurface drainpipes.
Life Expectancy of mole drains
The lifetime of a mole drain depends on the soil's stability and the soil moisture at mole depth during installation
Since the mole drain's effectiveness decreases over time, re-run the mole drains every 3-4 years although been shown to see results for many more years.
Benefits of Mole Plow
Mole Plow - Tillage implement, a perfect subsoiler, the unlined tunnel maker and more intensive drainage with additional porousness.
Unlike other higher range equipment and some traditional ways, it is very Cost effective.
It helps enhancing the soil drainage by the means of creating channels, it results into better drainage, which can prevent from root rot issues, improves overall Soil Health.
It improves porousness and soil structure by breaking dense soil layers. This helps deeper root penetration, higher organic matter and increase in water holding capacity, as a result nutrient intake is also improved, that helps increasing yield.
In the case of Saline soils, it is observed that, as increase of water movement through the soil, increases the downward movement of salts, reduced salinity can improve the soil fertility.
Useful for water conservation.
Improved soil aeration enhances healthier soil microbial activity resulting into increased yields.
Mole plowing boosts the root enhancement, having more water and nutrients, it makes the plant more resilient and can work as a stress remover.
As it breaks down the dense layers, helps in realizing previously unavailable nutrients.
Mole plowing can help to minimize soil erosion. Especially important on sloping terrain
As per research, the life span of a mole drain depends on the stability of soil and soil moisture at mole depth during installation.
Re-run of mole drain is required when effectiveness decreases.
As per research, the life span of a mole drain depends on the stability of soil and soil moisture at mole
depth during installation. Re-run of mole drain is required when effectiveness decreases.
"We are proud to have our Komb AG 40 Caliber Mole Plow, got selected and used by NMREEC, University of Missouri, USA"
"We are proud to have our Komb AG 40 Caliber Mole Plow, got selected and used by NMREEC, University of Missouri, USA"
Benefits of Mole Plowing
in heavy soil:
Suitability of mole drains
Moling is very suitable in heavy soil with a minimum of 45% clay content and less than 20% sand at the mole depth
Best time to install mole drains?
Best installation conditions usually occur during the summer months, when upper soil layer is as dry as possible
Combining mole drains with subsurface drainage
Mole drains can be combined with subsurface drainage to improve drainage performance in heavy clay soil. In this system, mole drains are installed perpendicular or diagonal to the subsurface drainpipes.
Life Expectancy of mole drains
The lifetime of a mole drain depends on the soil's stability and the soil moisture at mole depth during installation
Since the mole drain's effectiveness decreases over time, re-run the mole drains every 3-4 years although been shown to see results for many more years.
Benefits of Mole Plow
Mole Plow - Tillage implement, a perfect subsoiler, the unlined tunnel maker and more intensive drainage with additional porousness.
Unlike other higher range equipment and some traditional ways, it is very Cost effective.
It helps enhancing the soil drainage by the means of creating channels, it results into better drainage, which can prevent from root rot issues, improves overall Soil Health.
It improves porousness and soil structure by breaking dense soil layers. This helps deeper root penetration, higher organic matter and increase in water holding capacity, as a result nutrient intake is also improved, that helps increasing yield.
In the case of Saline soils, it is observed that, as increase of water movement through the soil, increases the downward movement of salts, reduced salinity can improve the soil fertility.
Useful for water conservation.
Improved soil aeration enhances healthier soil microbial activity resulting into increased yields.
Mole plowing boosts the root enhancement, having more water and nutrients, it makes the plant more resilient and can work as a stress remover.
As it breaks down the dense layers, helps in realizing previously unavailable nutrients.
Mole plowing can help to minimize soil erosion. Especially important on sloping terrain
As per research, the life span of a
mole drain depends on the stability of soil and soil moisture at mole depth
during installation. Re-run of mole
drain is required when
effectiveness decreases.
"We are proud to have our
Komb AG 40 Caliber Mole Plow,
got selected and used by NMREEC, University of Missouri, USA"
Our Address
KOMB Ag Services
823 Hwy 30, BOX 1381
Altona, MB, R0G 0B0
Contact
marlenb@kombagservices.ca
204-216-2662
Office: 204-216-2220
We'd love to hear from
you any time!
Our Address
KOMB Ag Services
823 Hwy 30, BOX 1381
Altona, MB, R0G 0B0
Contact
marlenb@kombagservices.ca
204-216-2662
Office: 204-216-2220
We'd love to hear from
you any time!
Our Address
KOMB Ag Services
823 Hwy 30, BOX 1381
Altona, MB, R0G 0B0
Contact
marlenb@kombagservices.ca
204-216-2662
Office: 204-216-2220
We'd love to hear from
you any time!
What our clients say
What our clients say
"The satisfaction I had after just hours after mole plowing my hill side, I had water running through the channels!"
T. Klassen
Manitoba
"The extra channels in my soil prior to tile installation greatly increased the effectiveness and ROI of my subsurface drainage system"
Wendell H.
North Dakota
"After running our plow through our low laying lands on grade with SD DRAIN, the depression areas all drained for the season. Cheap and effective without moving soil or pumping."
Loyd T.
Saskatchewan
"The satisfaction I had after just hours after mole plowing my hill side, I had water running through the channels!"
T. Klassen
Manitoba
"The extra channels in my soil prior to tile installation greatly increased the effectiveness and ROI of my subsurface drainage system"
Wendell H.
North Dakota
"After running our plow through our low laying lands on grade with SD DRAIN, the depression areas all drained for the season. Cheap and effective without moving soil or pumping."
Loyd T.
Saskatchewan
"The satisfaction I had after just hours after mole plowing my hill side, I had water running through the channels!"
T. Klassen
Manitoba
"The extra channels in my soil prior to tile installation greatly increased the effectiveness and ROI of my subsurface drainage system"
Wendell H.
North Dakota
"After running our plow through our low laying lands on grade with SD DRAIN, the depression areas all drained for the season. Cheap and effective without moving soil or pumping."
Loyd T.
Saskatchewan
"The satisfaction I had after just hours after mole plowing my hill side, I had water running through the channels!"
T. Klassen
Manitoba
"The extra channels in my soil prior to tile installation greatly increased the effectiveness and ROI of my subsurface drainage system"
Wendell H.
North Dakota
"After running our plow through our low laying lands on grade with SD DRAIN, the depression areas all drained for the season. Cheap and effective without moving soil or pumping."
Loyd T.
Saskatchewan
"The satisfaction I had after just hours after mole plowing my hill side, I had water running through the channels!"
T. Klassen
Manitoba
"The extra channels in my soil prior to tile installation greatly increased the effectiveness and ROI of my subsurface drainage system"
Wendell H.
North Dakota
"After running our plow through our low laying lands on grade with SD DRAIN, the depression areas all drained for the season. Cheap and effective without moving soil or pumping."
Loyd T.
Saskatchewan
"The satisfaction I had after just hours after mole plowing my hill side, I had water running through the channels!"
T. Klassen
Manitoba
"The extra channels in my soil prior to tile installation greatly increased the effectiveness and ROI of my subsurface drainage system"
Wendell H.
North Dakota
"After running our plow through our low laying lands on grade with SD DRAIN, the depression areas all drained for the season. Cheap and effective without moving soil or pumping."
Loyd T.
Saskatchewan
"The satisfaction I had after just hours after mole plowing my hill side, I had water running through the channels!"
T. Klassen
Manitoba
"The extra channels in my soil prior to tile installation greatly increased the effectiveness and ROI of my subsurface drainage system"
Wendell H.
North Dakota
"After running our plow through our low laying lands on grade with SD DRAIN, the depression areas all drained for the season. Cheap and effective without moving soil or pumping."
Loyd T.
Saskatchewan
"The satisfaction I had after just hours after mole plowing my hill side, I had water running through the channels!"
T. Klassen
Manitoba
"The extra channels in my soil prior to tile installation greatly increased the effectiveness and ROI of my subsurface drainage system"
Wendell H.
North Dakota
"After running our plow through our low laying lands on grade with SD DRAIN, the depression areas all drained for the season. Cheap and effective without moving soil or pumping."
Loyd T.
Saskatchewan
"The satisfaction I had after just hours after mole plowing my hill side, I had water running through the channels!"
T. Klassen
Manitoba
"The extra channels in my soil prior to tile installation greatly increased the effectiveness and ROI of my subsurface drainage system"
Wendell H.
North Dakota
"After running our plow through our low laying lands on grade with SD DRAIN, the depression areas all drained for the season. Cheap and effective without moving soil or pumping."
Loyd T.
Saskatchewan
"The satisfaction I had after just hours after mole plowing my hill side, I had water running through the channels!"
T. Klassen
Manitoba
"The extra channels in my soil prior to tile installation greatly increased the effectiveness and ROI of my subsurface drainage system"
Wendell H.
North Dakota
"After running our plow through our low laying lands on grade with SD DRAIN, the depression areas all drained for the season. Cheap and effective without moving soil or pumping."
Loyd T.
Saskatchewan
"The satisfaction I had after just hours after mole plowing my hill side, I had water running through the channels!"
T. Klassen
Manitoba
"The extra channels in my soil prior to tile installation greatly increased the effectiveness and ROI of my subsurface drainage system"
Wendell H.
North Dakota
"After running our plow through our low laying lands on grade with SD DRAIN, the depression areas all drained for the season. Cheap and effective without moving soil or pumping."
Loyd T.
Saskatchewan
"The satisfaction I had after just hours after mole plowing my hill side, I had water running through the channels!"
T. Klassen
Manitoba
"The extra channels in my soil prior to tile installation greatly increased the effectiveness and ROI of my subsurface drainage system"
Wendell H.
North Dakota
"After running our plow through our low laying lands on grade with SD DRAIN, the depression areas all drained for the season. Cheap and effective without moving soil or pumping."
Loyd T.
Saskatchewan
Our dealerlist
Our dealerlist
Rust sales Inc Harwood ND
Location Map:
Location Map:
Phil Birnie, wawota Sk
Hunt Equipment
Inc.
Phone: 306 5777 440
Location Map:
Chris Carlson
Chris
Carlson
Phone: 701 6909 060
Location Map:
Address:
KOMB Ag Services
823 Hwy 30, BOX 1381
Altona, MB, R0G 0B0
204-216-2662
Office : 204-216-2220
marlenb@kombagservices.ca
© 2024 All Rights Reserved by Mole Plow.
Website design and development by Alt Marketing.
Address:
KOMB Ag Services
823 Hwy 30, BOX 1381
Altona, MB, R0G 0B0
204-216-2662
Office : 204-216-2220
marlenb@kombagservices.ca
© 2024 All Rights Reserved by Mole Plow.
Website design and development by Alt Marketing.
Address:
KOMB Ag Services
823 Hwy 30, BOX 1381
Altona, MB, R0G 0B0
204-216-2662
Office : 204-216-2220
marlenb@kombagservices.ca
© 2024 All Rights Reserved by Mole Plow.
Website design and development by Alt Marketing.